Every week, on site, in writing.

We design your project, then we run the site: a meeting every week with the builders, minutes sent to you the same week, every invoice checked against the work actually done.

Site meeting minutes

Report no. 14

Date
Thursday, 9 a.m.
Weather
Dry, 11 °C
Present
Architect, carpenter, roofer, electrician, owners

Observations

  • Roof frame checked against the drawings: in place, braced.
  • Window openings measured: conform, joinery order confirmed.
  • Airtightness test to be booked before the linings.
  • Owners to choose the bathroom tiles by next meeting.

Next meeting: same time, next Thursday

From signed quotes to handover

1

Contracts signed

Each builder signs on the same specification, with a price and a start date.

2

Schedule agreed

One planning for all the trades, updated at every meeting.

3

Weekly meetings

On site, with the builders. The minutes reach you within the week.

4

Invoices checked

Each invoice compared with the work done before you pay it.

5

Handover

A written visit, reservations listed with a date to lift them. The guarantees start that day: one year for completion, two for equipment, ten for the building.

Sites delivered

All the files
2025

House among the vines

A 142 m² family house on a sloping plot, set into the ground to the north and wide open to the south.

Site
Saint-Cyr-au-Mont-d'Or
Built in
Timber frame, larch cladding, wood fibre insulation
Length
11 months on site
2024

Restored stone farmhouse

A farmhouse brought back to life: lime render, oak joinery and a barn turned into a living room.

Site
Lozanne
Built in
Rubble stone, lime render, oak joinery
Length
9 months on site
2025

Glass extension on a 1930s house

A 38 m² kitchen and dining room opening onto the garden, under a building permit.

Site
Caluire-et-Cuire
Built in
Steel frame, full-height glazing, reclaimed brick
Length
6 months on site
Every Thursday the minutes were in our inbox. We always knew who had to do what, and by when.
Hélène P.Renovation, Lozanne
An invoice was charging for a floor that was not finished. It was corrected before we paid.
Bruno and Lise G.New house, Brindas
We took them on for the site alone, with drawings from someone else. The handover list was lifted in three weeks.
Yann D.Extension, Sainte-Foy-lès-Lyon

Where does your project stand?

Drawings, permit, builders, works: tell us what is done. We can take over at any stage, after reading the drawings and the contracts.